Case Number PLN21223-ER01
Proposal to demolish all existing structures on the approximately 23.9 acre site and construct an approximately 430,000 square foot industrial warehouse facility including approximately 30,000 square feet of accessory office. The site would include an employee parking lot on the northern side of the proposed building and truck loading docks and parking on the southern side of the building. The proposal includes extending 37th Avenue to connect to Alameda Avenue, and a realignment of Alameda Avenue to provide expanded open space adjacent to the estuary shoreline. The proposal also includes creation of a separate parcel at the southeastern portion of the site at the intersection of 37th & Alameda Avenues to potentially accommodate a future commercial development of a retail/restaurant building. A project variant also is studied for the possible future extension of E. 7th Street east across Fruitvale Avenue to connect to 37th Avenue.
A number of the NOP public comment letters that were submitted to the City via e-mail included attachments which are only viewable in the on-line DEIR if the PDF document is downloaded. For ease of viewing we are adding this supplement of those attachments here in a separate PDF that does not require a download of the entire DEIR document to view. It should also be noted that all of the aforementioned emails and attachments/letters are included in the Administrative Record for the project, and comments in the letters were taken into consideration in preparation of the Draft EIR.
The Draft EIR included a GHG Reduction Plan, as required by the City's Standard Condition of Approval, which was provided for in Appendix G of the DEIR. The initial intent was to include the CalEEMod calculations in an attachment (Attachment A) to the Appendix. However, the attachment was inadvertently omitted. While the data has been in the Administrative record, the City is posting the information here as initially intended.
Was this page helpful?