East 12th St Bikeway Project / International Blvd Bikeway

This projects runs from E 12th St / 2nd St to 54th Ave and International Blvd / 54th Ave to 85th Ave.

Status:
In Process

About

This project will connect the Measure DD-funded projects around Lake Merritt to Fruitvale BART and to San Leandro St. The project is being developed and implemented in phases:

  1. E 12th St (2nd Ave to 14th Ave): pending implementation as part of AC Transit's Bus Rapid Transitproject.
  2. E 12th St (14th Ave to Fruitvale Ave:)bike lanes, installed December 2014, part of a federally funded multi-street resurfacing contract; see outreach mailer.
  3. E 12th St (Fruitvale Ave to 40th Ave): bike lanes, installed November 2011, funded by a Federal Stimulus grant through the Department of Energy and a grant from the Bay Area Air Quality Management District; see outreach mailer.
  4. E 12th St (1st Ave to Fruitvale Ave): bike wayfinding signs, under development
  5. E 12th St (40th Ave to 54th Ave): pending feasibility study
  6. International Blvd (54th Ave to 85th Ave): completed as part of AC Transit's Bus Rapid Transit project.

Partners

BAAQMD Logo
ACTC Logo