Contact: CIP Coordinator Jose Martinez (510) 238-6864
Measure DD projects along the Channel are intended to improve water flow, provide small boat passage, enhance bicycle and pedestrian access, restore wetlands, and make other Channel and shoreline improvements.
Major work includes replacement of the restrictive culverts at 10th Street with a clear-spanning bridge, and construction of a gated by-pass channel around the 7th Street Flood Control Station.
More information:
From October 18, 2006 Public Presentation:
- Background, Goals, Schedule (5.4mb)
- 7th and 10th Street Engineering Drawings (1.3mb)
- Preliminary Tree Inventory (408k)
- Public Art Ideas (4mb)
Revised Open Space Concept (Feb 2007)