325 Seventh Street Project 325-335 7th Street; 320-330 6th Street; 621-635 Harrison Street Initial Study Draft Environmental Impact Report Draft Environmental Impact Report -- Appendices Final Environmental Impact Report Addendum for revised 325 7th Street Project (CDV06573-R01) |
ER07002 |
College Avenue Safeway 6310 College Avenue at Claremont Avenue Environmental Impact Report (EIR) Documents |
ER09006 |
Gateway Community Development Project Southside of East 12th Street between 26th Avenue and Derby Avenue Draft EIR |
ER05001 |
Oakland Army Base Redevelopment Plan Draft EIR-April 2002 Draft EIR Appendix-April 2002 Draft EIR Traffic Supplemental- April 2002 Final EIR-July 2002 Remedial Action Plan / Risk Management Plan (RAP/RMP) – Sept. 2002 RAP/RMP Letter OARB Warehouse Feasibility Study - October 2006
Aggregate Recycling and Fill Project Initial Study/Addendum
2012 Oakland Army Base Project
Summary of the 2012 OARB Initial Study/Addendum Initial Study/Addendum (entire document)
Note: The IS/Addendum is also broken into four, smaller files for easier downloading: 1-Cover, TOC and Ch. 1 Introduction; 2-Ch. 2 Project Description; 3-Chapters 3.0 through 3.7; Chapters 3.8 through Chapter 4.0
Initial Study/Addendum Appendices: Appendix A: Air Quality and Greenhouse Gas Emissions Model Outputs Appendix B: Transportation and Traffic Outputs Appendix C: Water Supply Assessment Correspondence Appendix D: Tidelands Trust Exchange Agreement Materials Appendix E: 2002 Draft Environmental Impact Report Appendix F: 2002 Final Environmental Impact Report Appendix G: Supplemental Environmental Impact Report for the OARB Automall Project Appendix H: First Addendum to the Supplemental EIR for the OARB Automall Project Appendix I: 2002 Mitigation Monitoring and Reporting Program Appendix J: 2012 Mitigation Monitoring and Reporting Program Roadmap Appendix K: Draft Technical Memo: Traffic Analysis for Detour – 7th Street Grade Separation Appendix L: Feasibility Study for Adaptive Reuse of the Existing OARB Warehouses
Standard Conditions of Approval and Mitigation Monitoring and Reporting Program Report (SCA/MMRP):
Adaptive Reuse Feasibility Studies:
Addendum No. 2 to the 2002 Oakland Army Base Reuse Plan EIR CWS North Gateway Recycling Facility_Addendum July 2021
|
ER01035 |
Oakland Army Base Auto Mall Project (2006) Initial Study Notice of Preparation Draft SEIR Notice of Availability of Final SEIR Final SEIR SEIR Addendum SEIR Addendum Appendix |
ER06002 |
St John's Episcopal Church, Parking and New Sanctuary 5914 Thornhill Drive, 5928 Thornhill Drive, 1707 Gouldin Road, 1715 Gouldin Road, and 1676 Alhambra Lane Initial Study Draft Environmental Impact Report Draft Environmental Impact Report -- Appendices Final Environmental Impact Report St. John's Revised Scour Report- Appendix B to the Final Environmental Impact Report |
ER08001 |
Children's Hospital 747 52nd Street Notice of Preparation of a Draft EIR Historic Resource Evaluation for Children's Hospital Draft Environmental Impact Report Draft Environmental Impact Report -- Appendices A-B Draft Environmental Impact Report -- Appendix C Draft Environmental Impact Report -- Appendices D-E Draft Environmental Impact Report -- Appendix F Draft Environmental Impact Report -- Appendices G-I Final Environmental Impact Report |
ER0120013 |
Oakland Energy and Climate Action Plan (ECAP) Addendum to Previous CEQA Documents |
|
Broadway/MacArthur/San Pablo Redevelopment Plan Amendments Notice of Preparation Draft SEIR Draft SEIR Appendices |
ER11001 |
Foothill Square Redevelopment Project 10700 MacArthur Boulevard and 10605 Foothill Boulevard CEQA Documents |
ER08006 |
High and MacArthur Mixed Use Project 4311 & 4317 MacArthur Boulevard Initial Study Notice of Preparation of Draft EIR Draft EIR Draft EIR - Appendices Final EIR |
ER10001 |
Emerald Views Project 222 19th Street Draft Environmental Impact Report Draft Environmental Impact Report --Technical Appendices Volume I Draft Environmental Impact Report --Technical Appendices Volume II |
ER06009 |
42nd Avenue/High Street Access Improvement Project 2012 Addendum to the Initial Study/Mitigated Negative Declaration (MND) and Environmental Assessment (EA) for the Combined Project Study Report (PSR) / Project Report |
|
Lake Merritt Station Area Plan Final Environmental Impact Report (FEIR) July 28, 2014 Notice of Preparation (DEIR) Notice of Availability (DEIR) Draft Environmental Impact Report -- Volume I Draft Environmental Impact Report -- Volume II Appendix A: NOC and Comment Letters Appendix B: Development Potential Appendix C: Active Major Development Projects in Planning Area and Vicinity Appendix D: Transportation and Traffic Appendix E: CalEEMod Emissions Estimate Detail Appendix F: Water Demand Estimate Summary Appendix G: Cultural Resources Letter Appendix H: Alameda Point Project DEIR, Transportation and Circulation Chapter For more information on the Project, visit the Lake Merritt Station Area Plan project website |
ER110017 |
Broadway / Valdez District Specific Plan Final Environmental Impact Report (FEIR) May 1, 2014 Notice of Availability (NOA) of Final Environmental Impact Report (FEIR), April 24, 2014 Notice of Preparation Draft Environmental Impact Report (DEIR) - All Chapters Appendix A, Notice of Preparation, Public Scoping, and Comments Appendix B, Major Projects List Appendix C, Visual Simulations Map and Existing Conditions Figures Appendix D, Historic Resources Inventory Appendix E, Greenhouse Gases, Air Quality, and Noise Supplemental Information Appendix F, Biological Resources Supplemental Information Appendix G, Transportation and Circulation Supplemental Information Appendix H, Water Supply Assessment Appendix I, Alternatives Analysis Supplemental Information
DEIR Chapters separated for easier download: DEIR, Notice of Availability, Intro - Chapter 3 DEIR, Chapter 4.1 to 4.7 DEIR, Chapter 4.8 to 4.14 DEIR, Chapters 5 to 7 |
ER120005 |
1800 San Pablo Avenue Project (Fox Block Project) 1800 San Pablo Avenue Notice of Preparation Revised Notice of Preparation Draft Supplemental Environmental Impact Report Final Supplemental Environmental Impact Report |
ER110014 |
The Shops at Broadway (Broadway @ 30th Street) 3001-3039 Broadway Environmental Impact Report (EIR) Documents |
ER120007 |
Safeway Redevelopment Project (Broadway @ Pleasant Valley Avenue) 5050-5100 Broadway Environmental Impact Report (EIR) Documents |
ER090007 |
West Oakland Specific Plan Environmental Impact Report Documents |
ER120018 |
Coliseum Area Specific Plan Environmental Impact Report (EIR) Documents |
ER130004
|
Leona Heights Sulfur Mine Remediation Project Eastern terminus of McDonnell Avenue Notice of Creek Permit Application and Notice of Intent to Adopt a Mitigated Negative Declaration Draft Initial Study / Mitigated Negative Declaration Draft Initial Study / Mitigated Negative Declaration - Appendices |
ER130016 |
EBMUD Master Plan EIR Addendum to EBMUD Master Plan EIR, November 2013 |
|
3093 Broadway 3093 Broadway CEQA Documents |
PLN14272 |
2935 Telegraph Avenue Project (Courthouse Condominiums) 2935 Telegraph Avenue Updated CEQA Analyses Draft EIR (ER06-0012) Final EIR (ER06-0012) |
PLN14224 |
2270 Broadway 2270 Broadway CEQA Documents |
PLN14363 |
23rd Street and Valdez Project 2302 Valdez Street CEQA Documents |
PLN14340 |
Oak Knoll Mixed Use Community Plan Project Notice of Preparation of an Environmental Impact Report Notice of Availability and Release of the Draft Supplemental EIR (SEIR) Draft SEIR Appendices: A-D E-G H-I J-M N-Q R-U V-Z, minus W W AA BB CC DD EE FF GG Replacement CMP Analysis (Attachment V-H if this is corrupted) Response to Comment / Final Supplemental EIR Final Supplemental EIR Appendices Oak Knoll Mixed Use Community Plan Project - Tree Removal Permit Amendment CEQA Checklist dated September 2024 |
ER15004 |
City Center PUD Oakland City Center PUD DEIR Oakland City Center PUD FEIR Oakland City Center Project T5 & T6 Addendum City Center T56 Samuel Merritt University Project Addendum Oakland City Center T12 Addendum Oakland City Center T12 Addendum Appendix A Oakland City Center T12 Addendum Appendix B Oakland City Center T12 Addendum Appendix C Oakland City Center T12 Addendum Appendix D Oakland City Center T12 Addendum Appendix E Oakland City Center T12 Addendum Appendix F |
ER030021, PLN21249-ER01 |
2315 Valdez Street – 2330 Webster Street Project 2315 Valdez Street – 2330 Webster Street CEQA Documents |
PLN15040 |
1700 Webster Project 1700 Webster Street CEQA Documents |
PLN15138-R01 |
Jack London District 4th & Madison Project 180 4th Street and 431 Madison Street Environmental Impact Report (EIR) Documents |
ER15005 |
1640 Broadway Project 1640 Broadway 2000 Draft Environmental Impact Report 2000 Final Environmental Impact Report 2015 CEQA Analysis |
ER00002 PLN15281 |
Broadway & 27th Project 2630 Broadway CEQA Documents |
PLN15241 |
250 14th Street Mixed‐Use Project 250 14th Street CEQA Documents |
PLN15306-R01 |
2400 Valdez Project 2400 Valdez Street CEQA Documents |
PLN15336 |
500 Kirkham Street Project 500 Kirkham Street CEQA Analysis Checklist CEQA Analysis |
PLN15211 / ER16004 / PLN17428 |
5110 Telegraph Avenue Project 5110 Telegraph Avenue CEQA Analysis |
PLN15074 / ER16006 |
226 13th Street Project 226 13th Street CEQA Documents |
PLN15320 |
Claremont Hotel Club Expansion and Residential Project 41 Tunnel Road Notice of Preparation |
ER16010 |
Mountain View Cemetery Expansion Project (2016) 5000 Piedmont Avenue Draft Environmental Impact Report (June 15, 2016) DEIR Appendices (June 15, 2016) FEIR Notice of Availability (October 27, 2017) Final Environmental Impact Report (October 27, 2017) |
ER15001 |
24th and Harrison Streets Project 277 27th Street and 300, 302, and 304 24th Street CEQA Documents |
PLN16080 & PLN16080-R01 |
W12 Mixed Use Project 285 and 301 12th Street CEQA Analysis Checklist |
PLN16133 |
28th and Broadway (Broadstone on Broadway) 2800-2820 Broadway & 2855 Broadway CEQA Documents |
PLN16110 |
3000 Broadway 3000 Broadway CEQA Documents |
PLN16122 |
19th and Harrison Street Project 1750 Webster Street, 1810 Webster Street and 301 19th Street CEQA Documents |
PLN16071 |
0 Manzanita Drive Manzanita Drive between 2199 and 2211 Manzanita CEQA Environmental Review Checklist |
PLN15081 |
MacArthur Transit Village Draft EIR (Part 1, Part 2, Appendices 1, Appendices 2) Final EIR Addendum #1 (2010) Addendum #2 (2011) Addendum #3 (2015) Addendum #4 |
PUD06058 |
Eastline Project - 2100 Telegraph 2100 Telegraph Avenue Environmental Impact Report (EIR) Documents |
ER16011 |
500 Grand Avenue Project 500 Grand Avenue CEQA Documents |
PLN15015 |
Brooklyn Basin (formerly Oak-to-Ninth) Draft EIR Final EIR EIR Recertification Addendum #1 COA19 Timing Tech Memo COA19 Timing Change Memo Updated Notice of Availability for Draft EIR Marina Expansion Project (July 2021) Notice of Availability for Brooklyn Basin Marina Expansion FSEIR (December 2022) Brooklyn Basin Marina Expansion FSEIR (December 2022) Addendum #2
|
DA06011 PUD06010 |
1314 Franklin Street Mixed-Use Project 1314 Franklin Street CEQA Documents |
PLN16295 |
Oakland Walks! 2017 Pedestrian Master Plan Update CEQA Analysis 2002 Pedestrian Master Plan - Mitigated Negative Declaration |
GP17001 |
1721 Webster Street Project 1715 Webster Street, 1727 Webster Street, 1721 Webster Street, 1717 Webster Street CEQA Documents |
PLN16445 |
2305 Webster Street Mixed-Use Residential Project 2305 Webster Street CEQA Documents |
PLN23091 |
2500 Webster Street Project 2500 Webster Street CEQA Analysis Checklist |
PLN16304 |
411 West MacArthur Boulevard Project 411 W. MacArthur Boulevard CEQA Analysis Checklist |
PLN15258 |
International Boulevard Senior Housing Southeast corner of 105th Avenue and International Boulevard CEQA Analysis |
PLN15292-R01 |
2015 Telegraph Ave 2015 Telegraph Avenue and 2003 Telegraph Avenue CEQA Analysis |
PLN16456 |
2016 Telegraph Ave Project 2016 Telegraph Avenue and 490 Thomas L. Berkley Way CEQA Analysis |
PLN16455 |
1431 Jefferson Street Marriott Hotel Project 1431 Jefferson Street CEQA Analysis Attachments |
PL17033 / ER17003 |
Coliseum Area Redevelopment Plan Draft EIR |
ER93-22 |
2401 Broadway Project 2401 Broadway CEQA Analysis |
PLN16264 |
1100 Broadway Project 1100 Broadway Addendum #3 (Draft) |
CMD07390-R01 / ER97-32 |
Lighthouse Academy Project 701-735 105th Avenue CEQA Analysis |
PLN17041 |
1450 32nd Street Project 1450 32nd Street CEQA Analysis |
PLN17212 |
2 Kaiser Plaza Project 325 22nd St CEQA Analysis |
PLN17384 / ER16016 |
2044 Franklin Street Mixed-Use Project 2044 Franklin Street CEQA Analysis |
PLN17050 |
3300 Broadway Project 3300 Broadway CEQA Analysis |
PLN17005 |
Mandela Parkway Hotel Project 0 Mandela Parkway CEQA Analysis |
PLN16394 |
1940 Webster Street Mixed-Use Project 1940 Webster Street CEQA Analysis |
PLN17227 |
1433 Webster Street Mixed-Use Project 1433 Webster Street and 359 15th Street CEQA Analysis |
PLN16117 |
Aspire ERES Academy International Boulevard Project Southwest of the intersection of Derby Avenue and East 15th Street CEQA Analysis Attachments |
PLN15398 |
1900 Broadway Project 1900 Broadway Updated CEQA Analysis |
PLN15179 |
6501 Shattuck Avenue Mixed-Use Project 6501 Shattuck Avenue CEQA Analysis |
CDV10185 |
The Phoenix 801 Pine Street CEQA Analysis |
PLN18252 |
2201 Valley Street Project 2200 Telegraph Avenue, 2201 Valley Street CEQA Analysis |
PLN18115 |
GE Site Redevelopment 5441 International Boulevard Environmental Impact Report (EIR) Documents |
ER18013 |
Head-Royce School 4315 Lincoln Avenue
Notice of Availability of Head-Royce School PUD Final EIR
Head-Royce School PUD Project Final EIR
Notice of Preparation of an Environmental Impact Report
Head-Royce School Planned Unit Development (PUD) Project Draft Environmental Impact Report (DEIR)
Head-Royce School Draft Environmental Impact Report Notice of Availability
|
PLN18532-ER01 |
1750 Broadway Project 1750 Broadway CEQA Analysis Appendices |
PLN18369 |
Oakland Civic Auditorium Rehabilitation Project 10 10th Street CEQA Analysis |
PLN17101 |
4255 MacArthur Boulevard Project 4255 MacArthur Boulevard CEQA Analysis |
PLN16214 |
Kaiser Center Office Project 300 Lakeside Drive Environmental Impact Report (EIR) Documents |
ER08003/PUD08103-R01 |
Leimert Blvd Bridge Seismic Retrofit Project CEQA Analysis |
DS190070 |
California College of the Arts Redevelopment Project 5200 Broadway, 5276 Broadway Environmental Impact Report (EIR) Documents |
ER19003 |
230-240 West MacArthur Blvd Mixed-Use Project (One Piedmont) 230-240 West MacArthur Blvd CEQA Analysis (Addendum to Kaiser Permanente OMC Master Plan Project EIR) |
PLN17257-R01 / TPM10775 |
Oakland A's Waterfront Ballpark District at Howard Terminal Environmental Impact Report (EIR) Documents |
ER18016 |
Downtown Oakland Specific Plan Public Review Draft of Downtown Oakland Specific Plan CEQA Environmental Impact Report (EIR) Public Review Draft of Downtown Oakland Specific Plan CEQA Environmental Impact Report (EIR) Appendices |
ER18020 |
88 Grand Avenue Project 80-88 Grand Avenue, 2250 Broadway CEQA Analysis |
PLN18406 |
5200 Old Redwood Road Single Family Residence 5200 Old Redwood Road CEQA Notice of Intent to Adopt Mitigated Negative Declaration CEQA Initial Study / Mitigated Negative Declaration CEQA Notice of Determination for Mitigated Negative Declaration
|
PLN18512 |
500 Lake Park Apartments 500 Lake Park Avenue NEPA Environmental Assessment Determination and Findings (May 2020) |
ES18005 |
2600 Telegraph Ave Project 2600 -2630 Telegraph Avenue CEQA Exemption Analysis
|
PLN19283 |
2715 Adeline Street Project 2715 Adeline Street CEQA Analysis |
PLN16437 |
Viewcrest Townhouses Project Notice of Availability (NOA) of Draft Environmental Impact Report (DEIR)
Draft Environmental Impact Report (DEIR)
Notice of Preparation (NOP) of Environmental Impact Report
|
PLN18407-ER01 |
West Oakland BART TOD (Mandela Station) 1451 7th Street Environmental Review Documents |
PLN18490-R02 |
Longfellow Corner 3801-3829 Martin Luther King Jr. Way Environmental Assessment for Longfellow Corner (Sep. 2020)
|
ES19006 |
Oakland Vegetation Management Plan EIR Supplemental Notice of Availability (NOA): Notice of Extended Comment Period for the Draft Environmental Impact Report (DEIR) for the Oakland Vegetation Management Plan (PDF) Corrected Notice of Availability (NOA) of a Draft Environmental Impact Report (DEIR) for the Oakland Vegetation Management Plan and Notice of Public Hearing on DEIR Notice of Availability of the Draft Environmental Impact Report for the Oakland Vegetation Management Plan (PDF) Cover and Table of Contents (DEIR) (PDF) Executive Summary (DEIR) (PDF) Chapter 1 - Introduction (DEIR) (PDF) Chapter 2 - Project Description (DEIR) (PDF) Chapter 3 - Environmental Setting, Impacts and Mitigations - Sections 1 to 3 (DEIR) (PDF) Chapter 3 - Environmental Setting, Impacts and Mitigations - Section 4 (DEIR) (PDF) Chapter 3 - Environmental Setting, Impacts and Mitigations - Sections 5 to 14 (DEIR) (PDF) Chapter 4 - Other Statutory Considerations (DEIR) (PDF) Chapter 5 - Alternatives (DEIR) (PDF) Chapter 6 - References (DEIR) (PDF) Chapter 7 - Report Preparation (DEIR) (PDF) Appendices to the Draft Environmental Impact Report (DEIR) (PDF) Notice of Preparation of a Draft EIR for the Oakland Vegetation Management Plan – November 1, 2019 (PDF) |
ER20011 |
2424 Webster Office Project 2424 Webster Street CEQA Analysis
|
PLN19148 |
7th & Campbell Mixed-Use Project 166 7th Street 7th & Campbell EA 1-15-21 Appendix A-C Appendix D-E Appendix F-J Appendix K-O |
ES19001 |
24th & Waverly Project 261, 265, and 271 24th Street; 2359 Harrison Street; 2342, 2346, 2350, and 2356 Waverly Street CEQA Analysis
|
PLN20082 |
Mosswood Park Master Plan 3612 Webster Street Initial Study/Negative Declaration Notice of Intent to Adopt a Negative Declaration |
ER20008 |
1510 Webster Street Project 1510 Webster Street CEQA Analysis
|
PLN20107/PLN20107-R01/PLN20107-R02 |
1396 5th Street Mixed-Use Project CEQA Analysis |
PLN20101 |
Ancora Place 2227-2257 International Boulevard Environmental Assessment (April 2021) Signature page and Noise Waiver
|
ES19003 |
285 12th Street Affordable Family Housing 285 12th Street Documents |
ES19007 |
2432 Chestnut Street Residential Project CEQA Analysis |
PLN19279 |
2021 Peralta Hacienda Historic Park Master Plan update CM02160-R01 2002 Initial Study/Mitigated Negative Declaration 2021 Addendum
|
|
415 Thomas L Berkley Way (20th Street) |
PLN20092 |
1045 Derby Avenue & 0 29th Avenue CEQA Analysis Appendices A - O |
PLN20165 |
316 12th St CEQA Checklist Final July 2021 Attachment A-SCAMMRP Final Attachment B-Consistency Final Attachment C-Qualified Infill Final Attachment D-Infill Exemp Final
|
PLN20121 |
Veteran’s Square Affordable Housing ERR Memorandum 2021 Environmental Assessment May 2016 Re-Evaluation June 2016
|
ES21002 |
820 West MacArthur Boulevard 820 West MacArthur Boulevard Checklist Attachment A - City of Oakland Supplemental Form Attachment B - Applicant's Justification for Waivers and Concessions Attachment C - Standard Conditions of Approval and MMRP Attachment D - Project Consistency with Community Plans or Zoning Attachment E - Infill Performance Standards Attachment F - Criteria for Use of Addendum Attachment G - Geotechnical Investigation Report Attachment H - PI ESA and PII Subsurface Investigation Report Attachment I - Corrective Action Plan Attachment J - Transportation Study
|
PLN19-247 PLN21-037 |
3600 Alameda Avenue Project Environmental Impact Report (EIR) Documents |
PLN21223-ER01 |
3403 Piedmont Avenue Project Final CEQA Analysis
|
PLN21042 |
460 24th St. (Pigozzi Project)
|
PLN19026 |
Oakland 2045 General Plan Update
|
GP21002; GP21002-ER01; ZA 23002 |
2929 Broadway Mixed Use Project CEQA Analysis |
PLN21041 |
3050 International Blvd. Environmental Assessment (October 2022) EA Appendices EA Signature Page |
ES210001 |
The Phoenix Project - 801 Pine Street/ 800 Cedar Street Environmental Assessment (November 2022) EA Signature Page Noise Waiver |
ES20003 |
Inn by the Coliseum - 4801 Coliseum Way Environmental Assessment (November 2022) EA Signature Page Noise Waiver Attachments A-W |
ES22001 |
1431 Franklin Street - Office Project CEQA Analysis
Errata Memo |
PLN20124 |
1431 Franklin Street - Residential Project CEQA Analysis
Errata Memo |
PLN20125 |
1453 23rd Avenue - Charter School CEQA Analysis Non-CEQA Transportation Analysis |
PLN22158 |
Lincoln Square Recreation Center 250 10th Street CEQA Consistency Determination |
PLN22143 |
San Antonio Park Master Plan 1701 East 19th Street CEQA Checklist
|
ER2208 |
1600 Harrison Street NEPA Environmental Analysis (Categorically Excluded Subject To) (July 2023) CEST Appendices |
ESX23003 |
1919 Webster Street CEQA Analysis |
PLN22006 |
533 Kirkham Street CEQA Analysis |
PLN22173 |
East 12th Street Affordable Apartments 121 E. 12th Street NEPA Documents |
ES23003 |
Lifelong Medical 10605 Foothill Blvd. CEQA Analysis |
PLN20035 |
Supply Bank at Oakport 5601 Oakport Street CEQA Documents |
PLN19070 |
Lake Merritt BART PUD 51 9th Street Environmental Documents |
PLN20038 & PLN20108 |
Oakland Roots/Soul Temporary Stadium 8000 S. Coliseum Way Environmental Documents |
PLN24043 |
Jewish Community Center East Bay 5901 College Ave Environmental Documents |
PLN23117 |
7825 San Leandro Street Project 7531 - 8101 San Leandro Street Environmental Impact Report (EIR) Documents |
PLN24086-ER01 |
2700 International Blvd. NEPA Documents |
ES23001 |