Apply for a Traffic Control Plan (TCP)

Any partial or full street closure, sidewalk closure or bicycle lane closure; an approved traffic control plan is required. An associated Obstruction (OB) Permit is required.

Download
Traffic Control Plan Application 2024

If your project meets one or more of the conditions listed below your application will take a minimum of 10 days to process.

Your project, work site or limits of work:

1. Is located in a Holiday Restricted Street.

2. Is located in a Limited Operation Street.

3. Is within a street with commercially zoned land uses.

4. Has a work area of one city block or 300 feet or greater in length, whichever is less, along the street.

5. Provides less than 5 feet 6 inches of unobstructed sidewalk for sidewalk related work.

6. Requires lane closure with a work area of one city block or 300 feet or greater in length, whichever is less, along the street.

7. Requires street closures or traffic detour for all work area sizes. Note that depending on the nature of work and size of work area, proposed work in the parking lane may require full or partial street closure.

8. Requires full or partial closure of one or more signalized intersections (i.e. intersections controlled by a traffic signal, pedestrian signal, or railroad crossing signal) for all work area sizes. Note that this does not apply to intersections controlled by STOP or YIELD signs.

9. Is expected to impact State (Caltrans) right-of-way.

Incomplete applications are subject to delays and/or denials.

Was this page helpful?

Your feedback will help us improve our website. We cannot reply individually to all feedback.
Your feedback will help us improve our website. We cannot reply individually to all feedback.
Your feedback will help us improve our website. We cannot reply individually to all feedback.